Equipment MAIN ENGINE 1
Properties
Equipment table: | MACHINERY |
Type: | MACHINERY |
Description: | Gas turbine, water jet |
Compartment: | RERAFT |
Center of gravity: | X = 28.21 m, Y = -2.00 m, Z = 3.60 m |
X length: | 7.00 m |
Y length: | 3.00 m |
Z length: | 2.00 m |
Volume: | 42.0 m³ |
Mass: | 30.000 t |
Parent systems: | Eng1 Main engine 1 |
Redundancy groups: |
Location in the vessel:
Damage
The probability that this piece of equipment gets damaged is 20.61 %.
It's damaged in the following cases:
# | Name | Probability | Cause | Severity | Warhead | Detonation compartment |
---|---|---|---|---|---|---|
35 | EXOCET-RERAFT | 9.37 % | pressure | lost | EXOCET | RERAFT |
37 | EXOCET-RFO1P | 1.27 % | flooding | lost | EXOCET | RFO1P |
38 | EXOCET-RFO1S | 1.27 % | flooding | lost | EXOCET | RFO1S |
43 | EXOCET-RHANGAR | 5.14 % | pressure | lost | EXOCET | RHANGAR |
49 | EXOCET-ROFF1 | 0.81 % | fragments, pressure | lost | EXOCET | ROFF1 |
50 | EXOCET-ROMESS | 0.81 % | fragments, pressure | lost | EXOCET | ROMESS |
71 | EXOCET-HGST0P | 0.96 % | fragments, pressure | lost | EXOCET | HGST0-P |
72 | EXOCET-HGST0S | 0.96 % | pressure | lost | EXOCET | HGST0-S |